Residential lighting specs for Malmö homes

01 — Process Overview

Every engagement follows a documented sequence from initial enquiry to contractor handoff. Timelines assume a standard Malmö apartment (60–90 m²); larger or multi-storey scopes extend proportionally.

02 — Phase Table

PhaseActivityDurationDeliverable
P-01Enquiry review and scope confirmation2 business daysWritten scope summary and fee quote
P-02Desk study — floor plan and brief analysis3–5 daysPreliminary layer diagram
P-03On-site survey (if in scope)Half daySurvey notes: ceiling void, existing circuits, daylight photos
P-04Specification drafting — LUX-01 through LUX-051–3 weeksDraft specification set with parameter tables
P-05Client review meeting1 hourMarked-up draft with revision log
P-06Revision and finalisation3–7 daysFinal specification set (PDF)
P-07Fixture schedule and circuit diagram3–5 daysSchedule per LUX-05, single-line circuit drawing
P-08Contractor handoff1 hourWalk-through with electrician or builder
P-09Commissioning visit (if in scope)Half dayScene verification report per LUX-04

03 — Client Inputs Required

ParameterValueNotes
Floor planPDF or DWGWith room dimensions; hand-drawn acceptable if dimensioned
Renovation timelineStart and handoff datesDetermines phase scheduling
Contractor contactElectrician or builder nameFor P-08 handoff coordination
Finish paletteWall/ floor/ ceiling coloursAffects reflectance calculations
BRF rulesStyrordning if applicableSome Malmö BRFs restrict drilling in shared walls

04 — Prose — What You Receive

Final deliverables are structured as a numbered specification set referencing LUX-01 through LUX-05, a fixture schedule, a circuit diagram, and a scene preset table. Documents are issued as PDF via email. One round of revision is included in all packages; additional revision rounds are billed at 1 500 SEK per hour.

For fee details see CL-PRC-002 Fee Schedule. To begin, submit an enquiry via CL-CNT-001.